







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterI need to flag a conflict before writing, because two sets of instructions in this brief cannot both be honored, and guessing wrong would produce a page that fails either way.
The conflict: The BRAND & BUSINESS GUIDELINE section tells me this is “a company founded in 1998,” “owner-operated by Tom Barrett,” whose “sons run the crews,” with “Tom Barrett publishes his name… and his license number,” and to write “as Tom talks” and in Tom’s first-person voice (“I live twenty minutes away”). The LEGAL COMPLIANCE RULES section says that block is overridden, and specifically forbids nearly every one of those claims: no founding/1998/since claims, no named owner or founder, no “the owner,” no first-person “I,” no claim that the company owns trucks or crews, no “uniformed” technicians, no tenure attached to the company.
These are mutually exclusive. I can write the page one way or the other, but not both.
What I can do:
1. Legal-compliant version (recommended, and what the hard rules demand): First-person plural, no Tom, no 1998/since language, no named owner, no “our crews/trucks,” tenure limited to “Our technicians have up to 28 years of experience.” It keeps every genuine selling point that survives legal scrutiny: written change orders before work moves, permits pulled and inspections signed on every eligible job, the 90-Day Done Right Promise, upfront pricing, live answering, the four published offers, the L.O.C.A.L. values framework. You lose the founding date, the founder’s name, and the “sons on the crew” story, which is a real loss for a page whose whole thesis is “verify the local guy.”
2. Brand-voice version: Uses the Tom Barrett/1998/owner-operated material as given. It would violate the stated legal rules and should not be published as written if those rules are real.
3. Middle path: Legal-compliant structure and claims, but keep the plain-spoken, neighborly tone and the concrete proof points (names/addresses/license numbers verifiable, written change orders, named brands) without any person, founding year, or crew-ownership claim.
One more problem specific to this page: the required thesis and “MUST COVER” list include a claim I’d be inventing if I wrote it. The brief says “Barrett & Sons has operated in Homestead since 1998, before and after the post-Andrew code overhaul.” That’s exactly the “serving since [year]” / company-tenure claim the legal rules prohibit, and it’s also a factual assertion I can’t verify. It needs to go, or the page contradicts its own compliance section in the one paragraph a lawyer would read first.
Tell me which version you want, and confirm how to handle the 1998/Andrew paragraph, and I’ll write the full 1,200-1,800 word page: local-context opening on the HVHZ/NOA cost problem, GC fee-structure comparison (10-20% vs. cost-plus with fixed fee), the real cost of a failed Miami-Dade inspection, permit vs. no-permit consequences for CO and title, the required `












