How Long Does a Kitchen Remodel Take? (Homestead, FL)

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Homestead
A stone counter, tile backsplash and open shelf after a kitchen remodel
New painted shaker cabinets with an organized deep drawer
A remodeled kitchen with a waterfall island and wood cabinets
A new white vinyl privacy fence with a double gate
A remodeled hall bathroom with patterned floor tile and painted walls
A wood double vanity with two mirrors after a bathroom remodel
A finished backyard cottage with a small covered porch
A new roof with clean valleys and new flashing
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

How Long Does a Kitchen Remodel Take in Homestead, FL? The Short Answer

Most full kitchen remodels in Homestead take 9 to 16 weeks from permit submission to final inspection, and the permit review is the single biggest variable - not the demolition date. A realistic breakdown: 3 to 6 weeks of Miami-Dade permit review before a single hammer swings, then 6 to 10 weeks of actual construction. If a contractor hands you a start-to-finish number without mentioning permit lead times, they’re either guessing or skipping permits entirely. Call (866) 344-6796 and we’ll walk you through a real timeline for your Homestead kitchen.

Installers leveling a new base cabinet during a kitchen remodel

The Permit Is the Schedule

In Miami-Dade County, a kitchen remodel permit isn’t a formality. It’s a full plan review, and it starts the clock on everything else. We’ve seen homeowners in the older farm-town blocks near downtown Homestead sit with a signed contract and a finished design, waiting three to six weeks for plan review to clear before the first dumpster arrives. That’s normal here. It is not a sign anything went wrong.

Here’s why it matters more in Homestead than in most places. Miami-Dade operates under High-Velocity Hurricane Zone rules, and post-Andrew building culture means plans get looked at hard. If your remodel touches a load-bearing wall, moves a window, or adds any exterior penetration, the reviewer wants to see product approval (NOA) documentation, not just a sketch. A crew used to Broward or Collier Counties will underestimate that review cadence every time, and your timeline pays for it.

Barrett & Sons Construction Homestead pulls permits and schedules inspections on every eligible job. It’s not the part of the project anyone gets excited about, but it’s the part that keeps your timeline honest.

A Realistic Homestead Kitchen Timeline, Phase by Phase

Here’s what the schedule actually looks like when everything goes right. Budget the longer end of each range and you won’t be disappointed.

  • Permit application and plan review: 3 to 6 weeks. Complex layouts, structural changes, or moving plumbing take longer than like-for-like cabinet swaps. Submit early and completely - a kicked-back application restarts the clock.
  • Cabinet and material ordering: 4 to 10 weeks depending on the line. More on this below, because it’s the silent schedule killer.
  • Demolition: 2 to 4 days. Fast, messy, and the only part homeowners picture when they think “remodel.”
  • Rough-in trades (plumbing, electrical, HVAC adjustments): 1 to 2 weeks.
  • Rough-in inspection hold point: this is a mandatory pause. The county inspects the open walls before anything gets closed up. Budget several days to a week on the calendar for it.
  • Insulation, drywall, and patching: 1 to 2 weeks.
  • Cabinet installation, countertop templating and install: 1 to 2 weeks. Countertops alone need a template trip and a fabricator lead time, especially for Cambria quartz.
  • Tile, backsplash, trim, paint: 1 to 2 weeks.
  • Final inspections and punch list: 1 to 2 weeks.

Add it up and you’re looking at 9 to 16 weeks. A small kitchen with no layout changes and stock cabinets can land closer to 6 to 8 weeks. A full gut with a moved range and new windows can push past 16. The Kitchen Remodeling page breaks down what each phase includes, if you want the detail.

New architectural shingles with a clean valley

Cabinet Lead Times Are the Hidden Schedule Driver

Committing to a start date before cabinets are ordered is how kitchens end up torn apart for three weeks with nobody working in them. Semi-custom cabinets like KraftMaid take longer than stock, and that gap between order and delivery has to live somewhere in the schedule. If it doesn’t live in the schedule before demo, it lives in your empty kitchen afterward.

The order of operations matters here: get the design finalized, get the permit submitted, order the cabinets the same week if the line allows, and let the cabinet delivery window overlap the permit review. Done right, cabinets land the week demo finishes. Done wrong, you’re eating takeout in a construction zone wondering where your boxes are.

Every scope change, every allowance, every price adjustment gets written into a change order before it touches the job. An allowance that isn’t on paper is a surprise waiting for a date, and we’d rather you see the number before the work happens than after.

Why Inspections Actually Protect Your Timeline

Skipping a rough-in inspection feels like saving a week. It doesn’t. Here’s what really happens: the contractor closes the wall, the final inspection catches a problem, the wall comes back open, and now you’re re-doing drywall, repainting, and waiting on a re-inspection. That “saved week” turns into three or four.

Post-Andrew Homestead inspectors have seen every shortcut there is, and they’re thorough. The permit inspector works for you, not for us, and that’s exactly why the hold points belong in the schedule from day one. Build in the pause, pass the first time, move on.

What a Homestead Kitchen Remodel Costs

Timeline and budget move together, so here’s what the work actually runs in this market. These are market ranges, not a quote:

Kitchen work Typical Homestead range
Full kitchen remodel $14,000-$45,000
Small kitchen remodel $9,000-$20,000
Cabinet installation $4,000-$13,000
Countertop installation $2,000-$6,500
Backsplash installation $800-$2,500
Kitchen island installation $3,000-$10,000

A $14,000 job usually means cabinets and counters in an existing layout with no permit-triggering changes. A $45,000 kitchen is a full gut with moved plumbing, new lighting, and premium finishes. Most Homestead homes land somewhere in the middle. Call (866) 344-6796 for an exact quote - estimates are free, and you’ll get real numbers, not a phone quote that changes at the door.

Ask about these while you’re at it: $40 off any repair over $200, a free second opinion on any written estimate, no trip charge inside the county, and a permanent 10% senior and veteran discount.

Absentee Management Stretches 6 Weeks Into 14

The difference between a 6-week kitchen and a 14-week kitchen usually isn’t bad luck. It’s a project manager who shows up Monday, finds a problem, and doesn’t handle it until Thursday. Gaps like that compound, and by the end you’ve lost a month.

Our crews are on-site most days, and schedule issues get caught the same day, not the following week. Every completed job is backed by the written 90-Day Done Right Promise - if something isn’t done right, one call brings us back. That’s not a marketing line, it’s on the contract.

If you want to know more about how we run a kitchen in this city, our home page lays out the trades we handle.

FAQs About Kitchen Remodel Timelines in Homestead

Getting started with Barrett in Homestead

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Homestead team

A local vetted partner works across Homestead and the towns around it, to the same written standard as every Barrett job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Homestead? Licensed & insured · free written estimates
Call (866) 344-6796
Local Service Coverage

Request a Free Estimate in Homestead

Tell us what you need - Barrett & Sons Construction Homestead responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch